Real-time SPC Software Reduces On-Hold (to be sorted) Items from 14% to 2.5% in less than 3 months

A Hard Disk Cover manufacturer, in which the key process is Machining uses Real-time SPC Software to reduce their On-Hold Items from 14% to  2.5% in less than 6 months.

Case Study: Reduce On-Hold Items (OHI) from 14% to 2.5%

In the Real-time SPC Software implementation in this factory.

  1. A product (hard disk cover) is sampled every hour and sent to the QC Laboratory for testing.
  2. In the QC Lab, CMMs (Coordinate Measurement Machines) are used to measure the Product Sample.
  3. Immediate after all parameters for the Sample are measured by the CMM, the data is automatically transferred through LAN to the Real-time SPC Software Server.
  4. The Real-time SPC Software Server will analyze the data sent to it from the CMM to check for Out-Of-Specifications and Out-Of-Control Conditions.
  5. When the Real-time SPC Software Server detects any Out-Of-Specifications and Out-Of-Control Conditions, it will send an On-screen Alert to the Monitoring PCs that are located in the Production Area informing on the parameters which are Out-Of-Specifications or Out-Of-Control and the Machine that manufactures the Product Sample
  6. Whenever the Technicians and Engineers in the Production see An On-Screen Alert on the Monitoring PCs, they will investigate the problem at the machine.

Within 3 months of the implementation of the Real-time SPC Software, the factory achieves the following results:

  • On-Hold Items reduce from 14% to 2.5%
  • Rejects reduce from 5% to 0.3%
  • Manpower (used for Reporting purposed) is reduced by 40%
  • Response Time to Customer Queries reduces from 1 day to 30 mins
  • Customer Report Preparation Time reduces from 2 weeks to 1 day

Warning: count(): Parameter must be an array or an object that implements Countable in /home/fexsoft/public_html/wp-includes/class-wp-comment-query.php on line 399

Comments are closed.